Balanced Engineering & Construction Pte Ltd 18 Boon Lay Way #10-159 to 162 TradeHub 21, Singapore 609966     +(65) 6778 6858  sales@be-con.com  Staff Login

Project List by Country – Part 1

Project List by Country – Part 1

Project List by Country – Part 1

No Project Description Client Project Location Year
1 Design Supply and Installation of Internal Steelwork and Six (6) Internal Stell Flues China Harbour Engineering Company PteLtd Tuas, Singapore 2023
2 CD4 and Plat4 Inspection and Repair Shell Eastern Petroleum Pulau Bukom, Singapore 2023
3 Removal od LOC Stack Stainless Steel op Rim Ring Shell Eastern Petroleum Pulau Bukom, Singapore 2022
4 Rope Access Work Tan Sprinklers Works Shell Eastern Petroleum Pulau Bukom, Singapore 2022
5 8041-L Inspection and Repair & J2141-L Maintenance Works Singapore Refining Company Jurong Island, Singapore 2021
6 2101-L CRU Flare Stack Tip Project Works Singapore Refining Company Jurong Island, Singapore 2021
7 Fabrication and Installation of 23m Self Supported Chimney GP1 Pte Ltd Singapore 2021
8 Supply Of Labour SYNTEX Singapore 2021
9 Replacement of TE-J1011 Singapore Refining Company Jurong Island, Singapore 2021
10 Sulphur Pit 4701-F Improvement Project Singapore Refining Company Jurong Island, Singapore 2021
11 CD4 Stack Aircraft Obstruction Light Replacement Works Shell Eastern Petroleum Pulau Bukom, Singapore 2020
12 Repair of LOC Stack Top Ring/Rim Shell Eastern Petroleum Pulau Bukom, Singapore 2020
13 TA20RCC - 8005-L Chimney Stack Inspection & Maintenance for 2020 RCC Event Singapore Refining Company Jurong Island, Singapore 2020
14 Drone Inspection for CRU Flare (2101-L Flare) Singapore Refining Company Jurong Island, Singapore 2020
15 TA20RCC - V&Y anchors for 7301-B Refractory Repair Singapore Refining Company Jurong Island, Singapore 2020
16 7961-B Supply & Replace F1 Manhole Bricks Lining for 2020 RCC Event Singapore Refining Company Jurong Island, Singapore 2020
17 1085-L Chimney Stack Inspection - 1001-HB Steel Liner Singapore Refining Company Jurong Island, Singapore 2019
18 Supply of Manpower for PCS Boiler Stack Syntex Engineering Services Ltd PCS, Singapore 2019
19 RCC LP & HP Flare Stack Maintenance & Repair Works for 2020 RCC Event Singapore Refining Company Jurong Island, Singapore 2019
20 7701 - B & 7704-B & 7301 - B Refractory Materials for 2020 RCC Event Singapore Refining Company Jurong Island, Singapore 2019
21 Air Dispersion Modeling Meinhardt Infrastructure Pte Ltd Singapore 2019
22 Old Stack 8001-L Demolition Work Singapore Refining Company Jurong Island, Singapore 2019
23 6611-L Chimney Inspection Singapore Refining Company Jurong Island, Singapore 2019
24 Scrubber Tower Insulation Cladding LTH Baas Singapore 2019
25 1085-L (1001HD) Steel Liner Inspection Singapore Refining Company Jurong Island, Singapore 2019
26 CDU2 TAR 5106-L Chimney Stack External and Internal Inspection Singapore Refining Company Jurong Island, Singapore 2019
27 Manpower Supply to work at Exxon Mobil Singapore Refining Company Jurong Island, Singapore 2018
28 Refractory Repair Works for E3406 Catalyst Cooler Aztech Heat Exchangers Pte Ltd Singapore 2018
29 Inspection Works for SRU7 Stack - SCOT TA 2017 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2018
30 HCU Stack Check & Recify AWL Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2018
31 LRCCU (A3895) Stack Painting and Inspection & Repair Works. Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2018
32 CD3 - Coring on Ext. Concrete Wall Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2018
33 Confined Space Rescue Plan for Opacity Meter Calibration - ECC Boiler Stack 1,2,3 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2018
34 Reinforcement Works of 1085-L (Utility Stack for Boiler 1). Singapore Refining Company Jurong Island, Singapore 2018
35 Syntex Labour Supply Syntex Engineering Services LTD Jurong Island, Singapore 2018
36 Site Supervision for Flare Replacement John Zink Hamworthy Jurong Island, Singapore 2018
37 Senoko U8 & U7 Inspection and Repair Works Hitachi Plant Construction Ltd Singapore 2018
38 Feasibility Study (EM) Exxon Mobil Asia Pacific Pte Ltd Singapore 2018
39 1085-L: Line Repair Below Maintenance Floor Singapore Refining Company Jurong Island, Singapore 2018
40 1002-L Uty Flare Tip Seal & Airrester Singapore Refining Company Jurong Island, Singapore 2018
41 1085-L (1001HA) Steel Liner Inspection Singapore Refining Company Jurong Island, Singapore 2018
42 1085-L - Chimney Stack Inspection Singapore Refining Company Jurong Island, Singapore 2018
43 Syntex Labour Supply Syntex Engineering Services LTD Jurong Island, Singapore 2018
44 New Design & Build of 120m high RC Chimney with Four Steel Flues - Development Of 6th Waste-to-Energy Plant Hydrochem (S) Pte Ltd Tuas, SIngapore 2017
45 8001-L (VBU/CDU-1 Common Stack) – Structural Monitoring Works for 2016 Singapore Refining Company Jurong Island, Singapore 2017
46 Maintenance Work - CD4/Plat3 Stack Work (TA) - 2017 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2017
47 Labour supply to CR Asia CR Asia Singapore 2017
48 Greasing and Tensioning of Guy Wires of 2141-L Flare Stack Singapore Refining Company Jurong Island, Singapore 2017
49 F9901-4 & 9851 Stacks Inspection & Repair Works (HDS4/Plat 4) Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2017
50 HCU2 TAR - 2101-L Inspection and Repair Works Singapore Refining Company Jurong Island, Singapore 2017
51 Shell Refractory Dryout Works Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2017
52 8001-L (VBU/CDU-1 Common Stack) – Structural Monitoring Works Singapore Refining Company Jurong Island, Singapore 2016
53 Supply Flying Scaffold Brackets and Painting Material in Singapore Ferbeck Industrial Chimneys Sembcorp, Singapore 2016
54 Labor Supply for Emission Test @ PU2,PU6 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2016
55 Refractory Repair Works for F6601 A & B Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2016
56 Refactory Fabrication Works - Burner Throat Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2016
57 Chimney Inspection Work - LOC Stack TA 2016 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2016
58 Emergency Works - Steel Liner of 1001-HA of 1085-L (Utility Chimney Stack) Singapore Refining Company Jurong Island, Singapore 2016
59 8041-L Chimney Stack Inspection and Works for 2017 HCU-2 TAR Singapore Refining Company Jurong Island, Singapore 2016
60 External & Internal Inspection of 6611-L(CRU) Stack Singapore Refining Company Pulau Bukom, Singapore 2015
61 A1503 - HVU (HV5) Stack Inspection & Repainting Works Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2015
62 HCU stack general inspection and repair Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2015
63 Maintenance, Repair & Replacement Works at LP & HP Flare Units during RCC TAR 2015. Singapore Refining Company Jurong Island, Singapore 2015
64 CD5 (TA 2015) Stack Brick Replacement and General Inspection and Repair Shell Eastern Petroleum Pte Ltd Shell Eastern Petroleum Pte Ltd, Singapore 2015
65 1002-L Temporary Decking Platform and On-site Support for Removal and Replacement of Flare Tip Singapore Refining Company Jurong Island, Singapore 2015
66 RCC TAR 8005-L Chimney Works Singapore Refining Company Jurong Island, Singapore 2015
67 Acid Pit Repair Works Singapore Refining Company Jurong Island, Singapore 2015
68 Supply and installation of lighting arrestor/ conductor system to EBT workshop Tuas, EBT Engineering Singapore 2014
69 Internal Inspection at 1001-HC of 1085-L (Utility Chimney Stack) Singapore Refining Company Pulau Bukom, Singapore 2014
70 Skylift system and manpower supply Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2014
71 LRCCU Stacks Inspection works Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2014
72 CD3 Stacks Inspection Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2014
73 A15104 Stack (ECC) – Supply of AWL and AWL Spares Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2014
74 Internal inspection at 1001-HD of 1085-L Singapore Refining Company Jurong Island, Singapore 2014
75 A-15104 (ECC) Stack Inspection Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2014
76 External / Internal Inspection & External Painting on Entire Stack of 5106-L (CDU-2 stack) Singapore Refining Company Jurong Island, Singapore 2014
77 Internal Inspection at 1001-HB of 1085-L (Utility Chimney Stack) Singapore Refining Company Jurong Island, Singapore 2014
78 Replacement of Guy Cables for Chimney 210PL Singapore Food Industries Pte. Ltd. (SATs Food) Pandan Loop, Singapore 2014
79 Inspection, Testing and Painting Works of Communication Tower Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2014
80 TGU Stack Inspection and Painting Works Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2014
81 Inspection, Repair and Painting Works of CDU 1 Stack Syntex Engineering Services Jurong Island, Singapore 2014
82 VDU - Supply and Fabrication of Stainless Steel Cap Syntex Engineering Services Jurong Island, Singapore 2014
83 Labour Supply for Emission Test Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2014
84 Steam Line Repair Works to CRU Flare Stack Singapore Refining Company Jurong Island, Singapore 2014
85 YTL Cement Silos YTL Construction Pte Ltd Pulau Damar Laut, Singapore 2013
86 Workshop Expansion Works EBT Tuas, Singapore 2013
87 CRU Pit Stop - Fixing of Tilted Light Rod at 6611L Singapore Refining Company Jurong Island, Singapore 2013
88 Abseil trained labour supply UTOC Engineering Pte. Ltd Jurong Island, Singapore 2013
89 1002-L guy wires greasing and tensioning works Singapore Refining Company Jurong Island, Singapore 2013
90 Full Internal and External Inspection Including the Repair of 1085-L (Utility Chimney Stack) & 8001-L (VBU/CDU-1 Common Stack) Singapore Refining Company Jurong Island, Singapore 2013
91 F9901-9904, F9851 and F0301 Stacks Inspection Shell Eastern Petroleum Pulau Bukom, Singapore 2013
92 HDS2 Stacks Inspection Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2013
93 Internal inspection at 1001-HA of 1085-L Singapore Refining Co Pte Ltd Jurong Island, Singapore 2013
94 Manpower supply for annual emission test Setsco Services Pte Ltd Singapore 2013
95 Design and Build of 100m high Chimney for SEPL BUGIS Project (New SRU7 Plant) Chiyoda Singapore Pte. Ltd. Pulau Bukom, Singapore 2012
96 Full Internal and External inspection of the Chimney Stack 8041-L during HCU-2 TAR Singapore Refining Co. Pte. Ltd. Jurong Island, Singapore 2012
97 CD4 stack brick replacement and general inspection/ repair Shell Eastern Petroleum Pte. Ltd. Pulau Bukom, Singapore 2012
98 4710-F Sulphur Pit Repair during 2012 HCU-2 TAR Singapore Refining Co., Pte Ltd Jurong Island, Singapore 2012
99 HCU 2012 Shell Eastern Petroleum Pte. Ltd. Pulau Bukom, Singapore 2012
100 Inspection of Unit 4 Boiler Stack Liner & Stage 2 Stack Liners External and Associated Fixtures Power Seraya Ltd. Power Seraya, Singapore 2012
101 2141-L Flare Stack JGC Singapore Pte. Ltd. Jurong Island, Singapore 2012
102 Installation of Cable Tray and 4-PrThermocouple Cable Singapore Refining Co., Pte Ltd Jurong Island, Singapore 2012
103 Top Gantry and Insulation Repair Singapore Refining Co., Pte Ltd Jurong Island, Singapore 2012
104 Repair and Inspection for CSU chimney, with Internal Liner Gondola Access Shell Eastern Petroleum Pulau Bukom, Singapore 2012
105 Inspection of Unit 1 & 3 Boiler Stack Liner & Stage 1 Stack Liners External and Associated Fixtures Power Seraya Ltd. Power Seraya, Singapore 2012
106 Labour Supply at Jurong Island Syntex Engineering Services Jurong Island, Singapore 2012
107 Labour supply for emissions test Shell Eastern Petroleum (Pte) Ltd Pulau Bukom, Singapore 2012
108 Inspection of Unit 2 Boiler Stack Liner & Stage 1 Stack Liners External and Associated Fixtures Power Seraya Ltd. Power Seraya, Singapore 2011
109 7710-F Cleaning and Repairs to Sulphur Pit in 2011 RCC TAR Singapore Refining Co Pte Ltd Jurong Island, Singapore 2011
110 Supply and Application of 7961-B Furnace Singapore Refining Co Pte Ltd Jurong Island, Singapore 2011
111 Maintenance of Choked Fire Sprinkler Nozzles at Storage Tanks and Spheres Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2011
112 Inspection and Maintenance Works at RCC Common Flue Gas Stack (8005-L) during 2011 RCC TAR Singapore Refining Co Pte Ltd Jurong Island, Singapore 2011
113 LOC Stack Inspection Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2011
114 TGU Stack Internal Inspection and Repair Works Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2011
115 Inspection of HRSG Stacks for CCP Blk 30, 40 & 50 Senoko Power Ltd Senoko Power Station, Singapore 2010
116 Demolition of Concrete Chimney with 3 Flue Stacks (Senoko Demolition) Hitachi Plant Technologies Ltd Senoko Power Station, Singapore 2010
117 Inspection and top cap replacement to LRCCU stack Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2010
118 Fabrication of Skylift for LRCCU revamp (access works) Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2010
119 Sulphur Pits 702-JA &702-J Chemical Grouting (Internal Temporary Repair) Singapore Refining Co Pte Ltd Jurong Island, Singapore 2010
120 CD5 Stack Brick Replacement and General Inspection Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2010
121 ECC Project - Design & Construction of 100meter high Chimney Shell Eastern Petroleum Pte Ltd Pulau Ular, Singapore 2009
122 Communication Tower Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2009
123 CD3 Stack Modification Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2009
124 External Painting For Platformer 4 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2009 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2009
125 5701-F Sulphur Pit Singapore Refining Co. Pte Ltd Jurong Island, Singapore 2009
126 CDU 2 Singapore Refining Co. Pte Ltd Jurong Island, Singapore 2009
127 Detergent Expansion Project - Boiler U9005 & Stack Z-9010 Modification Works Chevron Oronite Pte Ltd Jurong Island, Singapore 2009
128 Inspection and Cleaning of Stage 1 Boiler Chimney Liner Unit 3 PowerSeraya Ltd Pulau Seraya Power Station, Singapore 2009
129 External Painting & Internal Inspection for HDS2 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2009
130 HCS Internal Chimney Inspection & Repair Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2009
131 Sulphur Pit 5701-F Sealing Works Singapore Refining Co. Pte Ltd Jurong Island, Singapore 2009
132 BRM Project - Design & Construction of 100meter high Chimney Foster Wheeler Asia Pacific Pte Ltd Pulau Bukom, Singapore 2008
133 Inspection, maintenance and washing of stage II and III stacks and its concrete windshields Senoko Power Ltd Senoko Power Station, Singapore 2007
134 Design & Construction of 100meter high Chimney Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2006
135 Internal / external inspection & repair of 8005-L (RCC chimney stack) Singapore Refining Co. Pte Ltd Jurong Island, Singapore 2006
136 Services for HDS4/Plat4 Stack TA Maintenance work April 2005 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2005
137 Maintenance & Repair to CD3 Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2005
138 Internal inspection and cleaning to nine (9) liners PowerSeraya Ltd Pulau Seraya Power Station, Singapore 2004
139 CD5 Concrete Stack Repair and Inspection Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2004
140 HCU Concrete Stack Repair and Inspection Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2004
141 TGU Concrete Stack Repair and Inspection Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2004
142 Internal / External inspection and brick repair of 5106-L (CDU2 chimney stack) Singapore Refining Co. Pte Ltd Jurong Island, Singapore 2004
143 Demolishing of 2 nos RC Chimneys at Jurong Power Station Beng Soon Machinery Services (S) Pte Ltd Jurong Power Station, Singapore 2004
144 Crack Repair & External Painting on 6611-L CRU Chimney Stack Singapore Refining Co. Pte Ltd Jurong Island, Singapore 2004
145 Maintenance to tank farm storage tank fire protection system (Sprinkler system and foam line) Oiltanking Singapore Ltd Jurong Island, Singapore 2004
146 Inspection, Maintenance and washing of one flue stack liner and its concrete windshield Senoko Power Ltd Senoko Power Station, Singapore 2004
147 To Inspect and Recommend Remedial Works to CDU 2 Stack Singapore Refining Co. Pte Ltd Jurong Island, Singapore 2004
148 L3401 Nov 2004 TA Inspection Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2004
149 LRCCU Nov 2004 TA Stack Maintenance Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2004
150 SRU Emission Study Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2004
151 Inspection of Stage 1 Stack Tuas Power Tuas Power Station, Singapore 2003
152 Pipeline cleaning, Caltex - Singapore Caltex Singapore Singapore 2003
153 Supply and installation of ladder fall arrestor system to Stage I stack PowerSeraya Ltd Pulau Seraya Power Station, Singapore 2003
154 Inspection of combined cycle plant 1 and 2 stack structure Senoko Power Ltd Senoko Power Station, Singapore 2003
155 Inspection of combined cycle plant 1 and 2 stack structure Singapore Refining Co. Pte Ltd Jurong Island, Singapore 2003
156 Internal/External Inspection & Repair 8041-L (HCU-2 Chimney Stack) Singapore Refining Co. Pte Ltd Jurong Island, Singapore 2003
157 External inspection to CD3 stack Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2003
158 Pipeline inspection PowerSeraya Ltd Pulau Seraya Power Station, Singapore 2003
159 Installation of Steel Liner for LOC/UTL Stack Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2002
160 Cleaning & Inspection of 4 nos. Steel Liners PowerSeraya Ltd Pulau Seraya Power Station, Singapore 2002
161 Maintenance & Repair to CD4 Stack Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2002
162 Cleaning, painting, and inspection of 5 chimneys Shell Refining Company Jurong Island, Singapore 2002
163 Inspection & Repair to CD3 (100m) & Hydrocracker (150m) Stack Shell Eastern Petroleum Pte Ltd Pulau Bukom, Singapore 2001
No Project Description Client Project Location Year
1 Provision of Manpower for CEMS Sampling Line Replacement Rabigh Power Company Rabigh, Saudi Arabia 2020
2 3 x 95m tall Steel Stack, External and Internal Visual Inspection Rabigh Power Company Rabigh, Saudi Arabia 2020
3 Repair of the Flare B-8101 A&B and B-8106 of Ethylene Flare (Yanpet) Saudi Yanbu Petrochemical Company Yanbu Al- Sinaiyah, Saudi Arabia 2014
4 Utility Stack-C at Yanbu Refinery Department for 2014 TRS Phase Saudi Arabian Oil Company (SAUDI ARAMCO) Yanbu Refinery, Saudi Arabia 2014
5 Al-Jubail Plant Chimney Unit #63 Repair Saline Water Conversion Corporation Saudi Arabia 2013
6 Completion of Remaining Chimney Works - 180m high RCC Chimney with 2 x 7.6m ID Steel Liners, Rabigh IPP Project Civil & Electromechanical Construction Co. Jeddah, Saudi Arabia 2012
7 Repair of Chimney Skirt and Hopper - Yanbu Power & Water Utility Company Marafiq, Saudi Arabia 2012
8 Boiler Unit #4 120m tall Steel Stack External and Internal Inspection SWCC Khobar Jeddah, Saudi Arabia 2011
No Project Description Client Project Location Year
1 New Design and Build of 3 no.s of 80m High RC Chimney with Single Flue each (9.0m ID) for Hsinta Power Plant Combined Cycle Renewal CTCI Corporation Yongan District, Kaohsiung City, Taiwan 2021
2 New Design and Build of 2 no.s of 150m RC Stack with 2 Flue each (6.2m ID) for Taichung Combined Cycle Power Plant CTCI Corporation Lung Ching District, Taichung City, Taiwan 2020
3 Supervision Works at Taiwan Thermal Heat Limited Kaohsiung, Taiwan 2015
4 Lin Kou Power Plant Renewal Project, Design and Built of 1 x 160m Chimney CTCI Corporation Lin Kou Power Plant, Taiwan 2013
5 Lin Kou Power Plant Renewal Project, Design and Built 2x58.9m Fly Ash Silos CTCI Corporation Lin Kou Power Plant, Taiwan 2013
No Project Description Client Project Location Year
1 New Design & Build of 200m high RC Chimney with Single Steel Flue, Mae Moh Power Plant Unit 4 - 7 Replacement Project. Marubeni Corporation Lampang Province, Thailand 2020
2 Labour Supply @ Rayong, Thailand Syntex Engineering Rayong, Thailand 2017
No Project Description Client Project Location Year
1 New Design and Build of One (1) X 230m high RC Chimney with two (2) internal steel flues for Quang Trach 1 Thermal Power Plant Project CC1- Construction Corporation No. 1 Vietnam 2021
2 New Design and Build of 240m High RC Chimney with Two (2) Internal flues for Van Phong 1 BOT Thermal Power Plant Project Doosan Heavy Industries Vietnam Co., Ltd. Khanh Hoa Province, Vietnam 2020
3 Service Contract for Extending of Existing RC Chimney Height (20 metre) NSG Vietnam Glass Industries Ltd. Vung Tau Province, Vietnam 2019
4 Chimney Inspection & Cap Fabrication / Installation Work Vietnam Float Glass Co. Ltd Phuong Lieu, Que Vo, Bac Ninh , Vietnam 2017
5 Thai Binh 2 Coal-Fired Thermal Power Plant (2x600MW) Petrovietnam Construction Joint Stock Corporation Thai Binh Province, Vietnam 2015
6 Hilti Anchors Replacement Works at Mong Duong 2 Stack Crawford Vietnam/ Hilti Vietnam Cam Pha Town, Quanh Ninh 2015

Accreditation:

  • Accredited
  • Accredited
  • Accredited
  • Accredited
  • Accredited