Hsinta Power Plant – Building Progress Inspired by Nature

As we navigate the intricate world of construction at the Hsinta Power Plant, every milestone reflects our teamwork and determination.

We are thrilled to announce that the sliding work for Unit 3 is complete, with a total concrete volume of 1,525 cubic meters. This achievement marks a significant step forward in our project timeline.

The insulation for Liner Can #01 is now complete, a testament to the dedication and hard work of our team. We are currently wrapping it in aluminium cladding, ensuring it performs exceptionally and stands the test of time.

Amidst the hustle and bustle, the construction of our permanent hoist has commenced. These activities are laying the groundwork for our next major milestone: lifting the roof beam.

 

Every step we take at Hsinta is a testament to our collective commitment to excellence.

 