The Quang Trạch I Power Plant is part of Vietnam’s national strategy to strengthen energy security and meet rising electricity demand. The facility comprises two ultra-supercritical coal-fired units with a combined capacity of 1,400 MW.
Balanced Engineering & Construction (BEC) was awarded the contract to construct the plant’s 230-metre environmental compliance chimney, a critical structure designed to manage emissions from the new generating units. Built on reclaimed coastal land, the chimney required precision engineering and safe high-rise execution under challenging site conditions.
The Quang Trạch 1 chimney was constructed using the slipform method, allowing for a continuous 24-hour pour of concrete to achieve a seamless 230-metre shaft.
Scope of work by BEC included:
The Quang Trạch I chimney was delivered safely, on time, and to specification, demonstrating BEC’s expertise in constructing one of Vietnam’s tallest industrial chimneys under challenging coastal conditions. The continuous 24-hour slipform casting showcased precision engineering, while borosilicate-lined flues provided long-term durability and emissions compliance.
By integrating civil, mechanical, and electrical systems, including steel platforms, coatings, lighting, and hoist provisions, BEC handed over a fully operational structure that strengthens the reliability of Quang Trạch 1 and supports Vietnam’s goal of securing stable energy generation.
Need expert engineering solutions for your critical infrastructure? Contact BEC to discuss how we can support your next project, from planning to execution.
Vietnam Electricity (EVN)
Consortium of MC,HDEC and CC1
Vietnam
March, 2025
+(65) 6778 6858
sales@be-con.com
BEC specialises in vertical structures within the energy infrastructure sector. Our expertise as an EPC contractor and unwavering commitment to delivering top-tier, innovative solutions sets us apart.
Copyright © 2024 Balanced Engineering & Construction Pte Ltd