Design and Build of Gas Separation Plant Chimney

Case Study

Design and Build of Gas Separation Plant Chimney

The Gas Separation Plant 6 (GSP6) in Map Ta Phut, Thailand is a key development by PTT Public Company Limited. With a production capacity of 800 MMSCFD, GSP6 plays a critical role in expanding Thailand’s petrochemical industry, enhancing the utilisation of natural gas resources from the Gulf of Thailand.

Samsung Engineering Co., Ltd. was appointed as the main contractor, and BEC Holdings Ltd. was awarded the contract for the design and construction of the chimney, a vital component of the plant.

Challenges

Limited Construction Space – The site constraints required strategic logistics planning for material handling and sequencing of construction activities.

Complex Lining System – The 5.0m diameter internal liner was constructed with 316L Stainless Steel and required four entry connections, making alignment a critical challenge. Ensuring precise positioning demanded advanced fabrication techniques, meticulous quality control, and high welding standards.

BEC's approach

BEC was responsible for the complete design and build of the chimney, including:

  • Foundation Work: Piling and pile cap installation
  • Structural Construction: Slipforming, heavy lifting of roof, floors, and flues
  • Safety & Operational Enhancements: Installation of an internal rack & pinion hoist, aircraft warning lights (AWLs), internal lighting, and a lightning protection system
  • High-Quality Fabrication: Precision welding and assembly of the 316L stainless steel liner

To overcome project challenges, BEC optimised logistics and work sequencing, ensuring seamless construction in a constrained environment. Through precision engineering and rigorous quality control measures, BEC upheld structural integrity and compliance with stringent industrial standards.

The BEC Advantage

  • Delivered on schedule and within budget despite technical complexities
  • Zero Lost-Time Incidents (LTI) – Safety-first approach
  • Seamless integration with Samsung Engineering’s project timelines
  • Supports Thailand’s natural gas production & national energy security
  • High-precision fabrication & construction expertise

 

The newly constructed chimney enhances the efficiency and safety of GSP6’s operations, playing a vital role in Thailand’s growing petrochemical sector. This project significantly contributes to Thailand’s energy infrastructure by maximising the utilisation of natural gas resources and reinforcing the nation’s energy security.

Projects Details:
Owner

PTT Public Company Limited

Client

Samsung Engineering Co., Ltd

Location

Thailand

Completed

September, 2009